What we deliver
- Design coordination with your consultant, or design-and-build through our partner architects
- Building permit, Civil Defence and DEWA approvals managed for you
- Substructure, reinforced concrete frame and blockwork
- MEP: air conditioning, plumbing, drainage and electrical
- Finishes: tiling, joinery, false ceilings, paint and external works
- Boundary wall, landscaping, pools and handover with as-built drawings
How villa costs are priced in Dubai
- Villa construction is priced per square foot of built-up area (BUA).
- Our current indicative ranges start from about AED 300 per sq ft for a standard specification, rising for premium and luxury finishes.
- The final price depends mainly on the materials, finishes and fittings you choose, the design and the site conditions.
- Use the free estimator on our home page for a budget, programme and permit list in 30 seconds.
Typical programme
- Design and approvals: 2–4 months
- Structure: 4–6 months
- MEP and finishes: 4–6 months
- A typical G+1 villa takes about 12–16 months from permit to handover.
Frequently asked questions
How much does it cost to build a villa in Dubai?
Indicative 2026 rates start from about AED 300 per sq ft of built-up area for a standard specification. Premium and luxury specifications cost more. The final price depends on the materials, finishes, design and site, and is fixed after a site survey and BOQ review.
Do you handle Dubai Municipality and DEWA approvals?
Yes. We prepare and follow up the building permit, Civil Defence approval and DEWA connection as part of the project.
Which areas do you build in?
Dubai and across the UAE, including Sharjah, Abu Dhabi, Ajman and the northern emirates.
Talk to our engineers
Office 132A, Al Asmawi Commercial Building, Ras Al Khor Industrial Area 2, Dubai · +971 55 651 6170 · info@dagiadeveloper.com
WhatsApp usOur services: Villa construction · Villa renovation · Warehouse construction · Fit-out · MEP · Maintenance & AMC · Ras Al Khor office · Al Qaser Al Massi Furniture
DAGIA